Thematic

[ANNOUNCEMENT] The “Golden Formula” Successfully Conquers 132 Minutes of EI120 Fire-Rated Duct Testing at IBST

31/12/2025

🔔[ANNOUNCEMENT] The “Golden Formula” Successfully Conquers 132 Minutes of EI120 Fire-Rated Duct Testing at IBST

In the construction of fire protection systems, finding an EI120-compliant duct structure that is both cost-optimized and technically reliable has always been a major challenge.
Instead of struggling with unverified solutions, apply a STANDARDIZED SOLUTION BY KH SHIELD—already tested and proven.

On December 11, 2025, at the Institute for Building Science and Technology (IBST), a duct system utilizing KHS.HF.MPro14 panels achieved an impressive benchmark:

🏆 RESULTS

ACHIEVED 132 MINUTES – SIGNIFICANTLY EXCEEDING EI120 REQUIREMENTS
(According to Test Report No. 307.25.KC.NCPCC)


🔍DECODING THE “FORMULA” BEHIND THE SUCCESS

This outstanding performance is driven by a carefully researched “golden ratio” structural design developed by KH Shield:

  • Core layer: 0.75mm galvanized steel sheet

  • Protective layer: 02 layers of KHS.HF.MPro14 panels (14mm thickness)

  • Connections: Fully synchronized in accordance with KH Shield’s technical guidelines


💡WHY IS THIS THE OPTIMAL SOLUTION FOR DEVELOPERS & CONTRACTORS?

1. Real Data Speaks Louder Than Promises

The 132-minute fire resistance result and an average temperature rise of only 101.4K serve as solid evidence of the system’s outstanding stability and reliability.

2. Comprehensive Protection (Anti-Corrosion)

KHS.HF.MPro14 panels are completely non-corrosive to metal, effectively eliminating concerns about galvanized steel duct corrosion after a short period of operation.

3. Safe & Sustainable

An inorganic material, free from Formaldehyde, ensuring health safety while remaining environmentally friendly.

4. Optimized Installation

With a lightweight density of 700 ± 50 kg/m³, the system significantly reduces ceiling load and enables faster, more efficient installation.

 


🚀KH SHIELD PROVIDES A FULL-SCOPE SOLUTION

  • Transfer of standardized system structures that have been successfully fire-tested

  • Detailed technical consultation and installation guidance

  • Provision of complete legal and compliance documentation for inspection and acceptance


📣 Contact us now to obtain the official IBST Test Report and detailed construction drawings

    

Register for consultation

Consultation on fire and explosion prevention solutions

    nhân viên KH Shield